
Project:
Repair of a cemetery wall, Bad Homburg
Description:
Repair of the cemetery wall after bulging and cracks were discovered on the side of a stream. Static – structural improvement through masonry needles and new pointing. Strengthening the base of the wall on the stream side.
Services:
Inventory and damage assessment with reports and cost estimates, property planning, structural planning, construction management
Projekt Duration:
2021 – 2022
Address:
Bad Homburg, Hessen